If you need assistance, please send an email to forum at 4hv dot org. To ensure your email is not marked as spam, please include the phrase "4hv help" in the subject line. You can also find assistance via IRC, at irc.shadowworld.net, room #hvcomm.
Support 4hv.org!
Donate:
4hv.org is hosted on a dedicated server. Unfortunately, this server costs and we rely on the help of site members to keep 4hv.org running. Please consider donating. We will place your name on the thanks list and you'll be helping to keep 4hv.org alive and free for everyone. Members whose names appear in red bold have donated recently. Green bold denotes those who have recently donated to keep the server carbon neutral.
Special Thanks To:
Aaron Holmes
Aaron Wheeler
Adam Horden
Alan Scrimgeour
Andre
Andrew Haynes
Anonymous000
asabase
Austin Weil
barney
Barry
Bert Hickman
Bill Kukowski
Blitzorn
Brandon Paradelas
Bruce Bowling
BubeeMike
Byong Park
Cesiumsponge
Chris F.
Chris Hooper
Corey Worthington
Derek Woodroffe
Dalus
Dan Strother
Daniel Davis
Daniel Uhrenholt
datasheetarchive
Dave Billington
Dave Marshall
David F.
Dennis Rogers
drelectrix
Dr. John Gudenas
Dr. Spark
E.TexasTesla
eastvoltresearch
Eirik Taylor
Erik Dyakov
Erlend^SE
Finn Hammer
Firebug24k
GalliumMan
Gary Peterson
George Slade
GhostNull
Gordon Mcknight
Graham Armitage
Grant
GreySoul
Henry H
IamSmooth
In memory of Leo Powning
Jacob Cash
James Howells
James Pawson
Jeff Greenfield
Jeff Thomas
Jesse Frost
Jim Mitchell
jlr134
Joe Mastroianni
John Forcina
John Oberg
John Willcutt
Jon Newcomb
klugesmith
Leslie Wright
Lutz Hoffman
Mads Barnkob
Martin King
Mats Karlsson
Matt Gibson
Matthew Guidry
mbd
Michael D'Angelo
Mikkel
mileswaldron
mister_rf
Neil Foster
Nick de Smith
Nick Soroka
nicklenorp
Nik
Norman Stanley
Patrick Coleman
Paul Brodie
Paul Jordan
Paul Montgomery
Ped
Peter Krogen
Peter Terren
PhilGood
Richard Feldman
Robert Bush
Royce Bailey
Scott Fusare
Scott Newman
smiffy
Stella
Steven Busic
Steve Conner
Steve Jones
Steve Ward
Sulaiman
Thomas Coyle
Thomas A. Wallace
Thomas W
Timo
Torch
Ulf Jonsson
vasil
Vaxian
vladi mazzilli
wastehl
Weston
William Kim
William N.
William Stehl
Wesley Venis
The aforementioned have contributed financially to the continuing triumph of 4hv.org. They are deserving of my most heartfelt thanks.
Registered Member #543
Joined: Tue Feb 20 2007, 04:26PM
Location: UK
Posts: 4992
Safety breaches reported at UK nuclear reactors Inspectors criticise EDF Energy for electricity failures and 'unplanned shutdowns' at its reactors in East Lothian last year
Rob Edwards Guardian.co.uk Tuesday 22 March 2011
EDF Energy, the company that runs Britain's nuclear power stations, has been reprimanded by government inspectors after a series of safety blunders at reactors in Scotland.
Two reactors at Torness in East Lothian have suffered failures in electricity supplies, several "unplanned shutdowns", and a seaweed blockage. It was the loss of power caused by the earthquake and tsunami that triggered the still unfolding nuclear disaster at Fukushima in Japan.
The revelations have reignited concerns about the safety of Britain's nuclear stations. French-owned EDF Energy admitted that it had not followed the correct procedures, but insisted that there had been no danger to the public.
A report posted online by the UK government's Nuclear Installations Inspectorate (NII) discloses that there were two significant safety "events" at Torness in the last three months of 2010. "Correct operational procedures appear not have been observed," says the report.
In one incident, an equipment malfunction cut off the electricity supplied to a gas circulator. Gas circulators are critical components because they ensure that air is kept moving to cool reactor fuel and prevent it from overheating.
The second incident also involved problems with electricity supply, though this time to a radioactive fuel dismantling facility at Torness. According to EDF Energy, the two events, which both occurred last September, were "entirely unconnected".
The NII report says: "The events included contributions from operators not complying in full with the instructions provided to ensure safe limits and conditions are observed during plant operations."
Nuclear inspectors have written to EDF Energy requiring more information about the incidents, and have received a response. The NII is satisfied there is "no immediate safety issue" but has left open the possibility of taking enforcement action in the future.
The report, which covers the final three months of 2010, also reveals that one Torness reactor had "several unplanned shutdowns, requiring action to correct adverse conditions which affected operation of the reactor". This happened after the reactor had restarted after a planned maintenance shutdown.
In addition, the second reactor at Torness had to be manually shut down because the screens that take in seawater for cooling were blocked by a large mass of seaweed. Inspectors identified "a number of areas where further enhancement may be possible" in the safety arrangements for dealing with seaweed.
"These are all events that should ring very loud alarm bells," said Pete Roche, an Edinburgh-based nuclear consultant and editor of the no2nuclearpower.org.uk website. "As we've seen with Three Mile Island, Chernobyl and now Fukushima, a combination of unexpected events all happening at once can quickly lead to a serious accident because of the highly dangerous nature of the fuel used to power these reactors."
The Scottish Nationalist MSP, Shirley-Anne Somerville, said: "EDF Energy must confirm that these issues have been resolved and that they have every measure in place to make sure there are no further problems at the plant."
She added: "The SNP's opposition to nuclear power has been long held and while there are nuclear power stations operating in Scotland we must take every possible step to ensure their safety."
EDF Energy, which owns British Energy, operates eight nuclear power stations across Britain. It is also the lead company bidding to build a new programme of nuclear power stations in England.
The director of Torness, Paul Winkle, argued that the company had a good safety record and welcomed input by the NII. The problems with electricity supplies to the gas circulators occurred because "one piece of a group of equipment failed", he said.
"While power to one gas circulator was removed, others operated as normal, as they are designed to do, and there was, therefore, no possibility of losing cooling."
The issue with power supplies to the radioactive fuel dismantling facility was reported to the NII because "we hadn't followed procedure exactly as we should", he added.
According to Winkle, the seaweed blockage had been predicted by "sophisticated monitoring systems". None of the incidents had caused any danger to staff, plant or the public, he insisted.
This site is powered by e107, which is released under the GNU GPL License. All work on this site, except where otherwise noted, is licensed under a Creative Commons Attribution-ShareAlike 2.5 License. By submitting any information to this site, you agree that anything submitted will be so licensed. Please read our Disclaimer and Policies page for information on your rights and responsibilities regarding this site.